§ 5. Product  


Latest version.
  • 5.1. Sanitary Sewer Information Required.

    • All vertical and horizontal alignment (profile and plan).

    • Size, slopes, and materials to be used.

    • Invert and rim elevations.

    • Location and details of manholes.

    • Other existing and proposed utilities should be shown in order to avoid conflicts during construction.

    • Design sanitary flow calculations with Professional Engineer's stamp, except for sanitary service connections. Calculations shall conform to the Department of Environmental Management (DEM) requirements.