§ 11-112. Noncompliance  


Latest version.
  • If, at any stage, the work in progress and/or completed under the terms of an approved erosion and sediment control plan does not conform to the plan, a written notice from the building official or his designee to comply shall be transmitted by certified mail to the owner. The notice shall set forth the nature of the temporary and permanent corrections required and the time limit within which corrections shall be completed as set forth in section 11-113(b). Failure to comply with the required corrections within the specified time limit shall be considered in violation of this article, in which case the performance bond or cash or negotiable securities deposit shall be subject to notice of default, in accordance with section 11-107(b) and (c).

(Ord. of 6-3-1991, art. VI, § 1)